Underground Storm Shelters — Lubbock & West Texas(806) 241-8862
    Sheltris Storm Shelters

    Professional Storm Shelter Installation

    A shelter is only as reliable as its installation. Every Sheltris shelter is installed by our professional crew — most in a single day.

    0PSI

    Concrete Strength

    0lbs

    Shelter Weight

    0mph

    Wind Rating

    0Day

    Installation Time

    Cross-section diagram of Sheltris storm shelter installation showing steel door, butyl joint, steel stairs with handrail, gravel base, and drain tile

    Step-by-Step Installation

    1

    Site Assessment

    We evaluate your property for optimal placement, soil conditions, utility clearances, and drainage patterns. Every property in West Texas is different — caliche depth, yard access, and grade all factor into the plan.

    2

    Permits & Scheduling

    Most municipalities require a building permit for storm shelter installation. The homeowner is responsible for obtaining the required permit before installation begins. We can provide manufacturer specifications, site plans, and documentation to support your application. Once your permit is approved, we schedule your installation date.

    3

    Excavation

    The site is excavated to 52 inches deep, sized precisely for the shelter. Lubbock's caliche layer requires professional equipment and experienced operators.

    Storm shelter installation step 3: Excavation — Sheltris West Texas
    4

    Gravel Base

    A 6-inch compacted gravel base is laid at the bottom of the excavation. This provides proper drainage and a stable foundation for the shelter.

    Storm shelter installation step 4: Gravel Base — Sheltris West Texas
    5

    Shelter Placement

    The reinforced concrete shelter is lowered into position using a crane. The base is set with 3 inches exposed above grade.

    Storm shelter installation step 5: Shelter Placement — Sheltris West Texas
    6

    Sealing & Securing

    Butyl sealant is applied before lid installation. The lid is secured with manufacturer-specified straps and bolts.

    Storm shelter installation step 6: Sealing & Securing — Sheltris West Texas
    7

    Final Grading

    The excavated soil is backfilled and graded to direct water away from the shelter. Your yard is left clean, accessible, and properly drained.

    8

    Walkthrough

    We walk you through your new shelter — door operation, latching system, interior features, and maintenance. Any required municipal inspection is the homeowner's responsibility to schedule.

    Real Installations

    Worker securing storm shelter lid with chains during installation in Lubbock TX
    Lid secured — Lubbock, TX
    Completed underground storm shelter installation in Spur TX by Sheltris
    Completed — Spur, TX
    Workers preparing gravel base for storm shelter in Roaring Springs TX
    Gravel base — Roaring Springs, TX

    Frequently Asked Questions

    How long does installation take?
    Most residential installations are completed in a single day, depending on soil conditions and site access.
    Who is responsible for the building permit?
    The homeowner is responsible for obtaining the required building permit from their local municipality before installation. We provide all necessary manufacturer specifications, engineering documentation, and site plans to support your permit application.
    Will my yard be damaged?
    We excavate precisely and restore your yard with proper backfill and grading. Some landscaping may need to be replanted around the immediate installation area, but we minimize disruption.
    Can the door be opened if debris lands on it?
    Yes. The door and 3-point latching system are designed to be operable from the inside, even if the exterior surface is damaged or obstructed by debris.
    "A shelter is only as reliable as its installation."

    Ready to protect your family? Get a free quote in 60 seconds.

    Get Your Free Quote

    Related Resources

    Call NowFree Quote